Run Blueprint against a real bid.
Send one live package. You get back a risk register on it: every finding carrying the rule that caught it, the evidence, the source page, and a recommended pre-bid action you can file as an RFI.
The exchange, stated plainly
- You receive
- A full risk register on a live bid package, sourced line by line. Each finding names the rule that fired, quotes the evidence it fired on, cites the document and page it came from, and states the pre-bid action that closes it.
- You give
- Structured feedback on those findings. Which were useful, which were noise, and what the package contained that Blueprint did not raise. Roughly thirty minutes.
Pilot scope and terms are agreed after the project-fit review. No pricing is published because none has been set.
Reviews are run one at a time, by one person. That is the only limit on how many run, and it is the reason a request is answered with a conversation rather than a queue position.
What happens after you send this
- Request a review with basic project information The form below. Project type, rough package size, what you bid. No documents, no specification text.
- Confirm project fit, document types and confidentiality requirements Electronic security scope, a project manual carrying Division 08 and Division 28 sections, and enough time before bid for a finding to still be worth an RFI. Handling terms are settled in writing first, including what happens to the files afterwards.
- Blueprint runs the supported review The specification and project-manual cross-check at the Division 08 to Division 28 seam, plus the scope-ownership and access-control opening rules. What is outside that is named before the run, not after it.
- The estimator reviews the risk register and the evidence behind each finding Every line opens to the rule text, the quoted evidence and the citation, so a finding can be accepted or rejected on the document rather than on trust.
- Results are adjudicated so the system can be measured and improved Each finding is marked useful, noise or wrong, and anything missed is recorded against the package. That adjudication is what turns a register into a measurement, and it is the part no amount of engineering can produce on its own.
Do not send documents through this form. There is no file field on this page and no column in the database that could hold one. Bid documents are handled by direct arrangement after the handling terms are agreed, which is a design decision rather than a missing feature.
What Blueprint does not detect
Not mid-bid this week
Not bidding this week? Take the Division 08/28 seam checklist
Twelve questions to ask of an electronic security bid package before you price it.
Rather just talk
Email [email protected] or reach Muhammad on LinkedIn. Both go to the same person.
Four required fields. It should take under a minute.
You can evaluate most of this without talking to anyone.
The sample register
Five real findings from one Division 08 to 28 seam, with the command that produced them and the config hash.
Every rule
Conditions, rationale and cited authority for every check the engine performs.
Where documents go
The document pipeline runs locally. This page says exactly what that covers and what it does not.